Site preparation & earthworks
Clearing, setting out, excavation, shoring and compacted fill. The stage nobody sees and everything else sits on.
Discuss this stageServices
Read it top to bottom — that is the order a building actually goes up in, and the order we hand it over.
Clearing, setting out, excavation, shoring and compacted fill. The stage nobody sees and everything else sits on.
Discuss this stageFootings, raft and strip foundations, columns, slabs, retaining walls and blockwork — steel fixed and poured to drawing.
Discuss this stageStone cladding, rendering, thermal insulation, waterproofing and roofing. The envelope that decides your maintenance bill.
Discuss this stagePlumbing, drainage, electrical distribution, HVAC and ventilation — first fix through testing and commissioning.
Discuss this stagePlastering, screeding, tiling, gypsum, joinery, painting and final fit-out to the level of detail you actually live with.
Discuss this stageHome automation, lighting scenes, climate control, CCTV, intercom and access control — cabled during first fix, not retrofitted after.
Discuss this stageStrip-outs, structural alterations, apartment and villa refurbishment, plus scheduled maintenance on what we built.
Discuss this stageSend the drawings or a few photos. You get a walkthrough of the stages, a programme, and a number.